{"id":3112,"date":"2026-10-25T16:44:45","date_gmt":"2026-10-25T16:44:45","guid":{"rendered":"https:\/\/retrotradingreport.com\/index.php\/2026\/10\/25\/why-goldman-sachs-views-grid-and-utilities-as-the-key-ai-growth-bottlenecks\/"},"modified":"2026-10-25T16:44:45","modified_gmt":"2026-10-25T16:44:45","slug":"why-goldman-sachs-views-grid-and-utilities-as-the-key-ai-growth-bottlenecks","status":"publish","type":"post","link":"https:\/\/retrotradingreport.com\/index.php\/2026\/10\/25\/why-goldman-sachs-views-grid-and-utilities-as-the-key-ai-growth-bottlenecks\/","title":{"rendered":"Why Goldman Sachs views Grid and Utilities as the key AI growth bottlenecks"},"content":{"rendered":"<div><\/div>\n<p>AI development is increasingly dependent on the physical infrastructure needed to power data centres, with electricity supply, grid connections and utility investment emerging as critical constraints on the industry&#8217;s expansion, according to Goldman Sachs.<\/p>\n<p>While advances in AI models continue to drive demand for computing capacity, the infrastructure required to support that growth operates on a much longer timeline. <\/p>\n<p>Transmission lines, substations, power generation facilities and data centres can take years to develop, potentially slowing the deployment of AI systems even as computing technology advances.<\/p>\n<p>Goldman Sachs Research expects global data centre power demand to increase by 170% between 2025 and 2030, with more than 60% of the growth coming from the US. <\/p>\n<p>However, supply-chain constraints, permitting requirements and limited grid capacity could moderate the pace of expansion.<\/p>\n<p>\u201cPower is probably the forever bottleneck,\u201d said Jason Tofsky, global head of Digital Infrastructure Investment Banking at Goldman Sachs.<\/p>\n<p>He noted that delivering a successful project requires coordination across numerous areas, including financing, over a period that can range from six months to two years.<\/p>\n<h2 class=\"wp-block-heading\">AI growth depends on more than computing capacity<\/h2>\n<p>The AI industry requires substantial investment in computing hardware, data centres and power infrastructure. <\/p>\n<p>Goldman Sachs estimates that aggregate AI capital expenditure could reach $7.6 trillion between 2026 and 2031 across these areas.<\/p>\n<p>Financing this expansion will require substantial borrowing alongside other sources of capital. <\/p>\n<p>Goldman Sachs Research projects that global hyperscaler debt issuance will reach $420 billion in 2027, more than 60% above its estimate for the 2026 financial year.<\/p>\n<p>Hyperscalers, however, account for only around 40% of credit raised across the AI ecosystem, highlighting the broader financing requirements associated with the industry&#8217;s expansion.<\/p>\n<p>These investments depend on more than the availability of capital. <\/p>\n<p>Data centre developers must secure land, obtain regulatory approvals, source equipment, arrange electricity supply and complete construction before facilities can become operational.<\/p>\n<p>The process creates multiple potential bottlenecks. <\/p>\n<p>Delays in any one area can affect the entire project, regardless of how quickly AI models or computing hardware improve.<\/p>\n<h2 class=\"wp-block-heading\">Grid capacity emerges as a critical constraint<\/h2>\n<p>The US electricity grid faces growing pressure as data centre developers seek access to large amounts of power. <\/p>\n<p>One challenge is the volume of projects waiting to connect to the grid.<\/p>\n<p>According to Goldman Sachs, the US interconnection queue contains roughly 2,600 gigawatts (GW) of generation and storage projects. <\/p>\n<p>This is more than twice the installed capacity of the existing grid.<\/p>\n<p>The size of the queue does not mean all proposed capacity will be built. <\/p>\n<p>However, it illustrates the scale of demand competing for access to grid infrastructure.<\/p>\n<p>The median time between submitting an interconnection application and reaching commercial operation is now approximately five years, with some projects taking longer.<\/p>\n<p>Transmission infrastructure is another constraint. <\/p>\n<p>Goldman Sachs Research data show that US construction of new high-voltage transmission lines declined from an annual average of 1,700 miles between 2010 and 2014 to just 350 miles between 2020 and 2023.<\/p>\n<p>Equipment shortages can extend the timeline further. <\/p>\n<p>Environmental reviews may take three to four years, while lead times for high-voltage substations and generation step-up transformers have stretched to roughly three to five years.<\/p>\n<h2 class=\"wp-block-heading\">Utilities face rising investment requirements<\/h2>\n<p>The growing demand for electricity is changing the outlook for utilities, a sector traditionally associated with relatively low growth and defensive investment characteristics.<\/p>\n<p>Goldman Sachs expects aggregate utility capital plans to reach $1.3 trillion between 2026 and 2030. <\/p>\n<p>The projected spending reflects the need to expand infrastructure to accommodate rising electricity demand, including that generated by AI data centres.<\/p>\n<p>Utilities must determine how to finance new generation capacity, transmission lines and substations while ensuring that infrastructure can support additional large-scale electricity consumers.<\/p>\n<p>Hyperscalers and other large electricity users are increasingly considering arrangements in which they contribute directly to the cost of the generation and grid infrastructure required to serve their facilities.<\/p>\n<p>These arrangements could help align investment in digital infrastructure with the capacity needed to supply it.<\/p>\n<p>Tyler Miller, global co-head of Power, Utilities, and Infrastructure Investment Banking at Goldman Sachs, described the principle behind this approach as straightforward: \u201cGrowth enables growth.\u201d<\/p>\n<p>The idea is that investment in data centres can support additional investment in electricity infrastructure, provided that the costs and benefits are appropriately coordinated.<\/p>\n<p>For utilities, the opportunity is accompanied by substantial execution and financing requirements. <\/p>\n<p>Capital must be committed to projects that may take years to complete, while developers must manage equipment availability, regulatory approvals and uncertainty over the timing of future demand.<\/p>\n<h2 class=\"wp-block-heading\">Behind-the-meter power offers an alternative<\/h2>\n<p>The constraints affecting grid connections have encouraged greater interest in alternative power arrangements, including behind-the-meter projects.<\/p>\n<p>A grid-connected data centre must secure the necessary approvals to connect to the electricity network. <\/p>\n<p>Behind-the-meter projects can avoid some of these grid constraints by arranging power supply outside the conventional grid connection process.<\/p>\n<p>However, these projects do not eliminate the broader challenges associated with building power infrastructure. They may face air-permitting requirements and longer environmental reviews, depending on the project.<\/p>\n<p>Goldman Sachs also identifies hybrid power arrangements and fuel cells as part of the changing mix of electricity sources supporting US data centres.<\/p>\n<p>Its analysis of US data centre power demand indicates that grid-supplied electricity remains the dominant source, while behind-the-meter and fuel-cell power contribute increasing amounts in the later forecast years.<\/p>\n<p>The relative appeal of these alternatives will depend on the constraints facing individual projects. <\/p>\n<p>Avoiding some grid limitations does not remove the need to secure equipment, obtain permits, and finance construction.<\/p>\n<p>For investors, the development of alternative power arrangements creates additional infrastructure opportunities.<\/p>\n<h2 class=\"wp-block-heading\">Permitting and community opposition add to project risks<\/h2>\n<p>The expansion of data centres also depends on local regulatory decisions and community acceptance.<\/p>\n<p>Large projects can place pressure on local infrastructure, including roads and public services. <\/p>\n<p>Concerns about noise, emissions, water consumption, traffic and the potential effect on residential electricity bills can influence whether developments proceed as planned.<\/p>\n<p>Goldman Sachs reported that, since January 2026, 86 projects had been cancelled or significantly delayed, with 76 directly linked to local opposition.<\/p>\n<p>The figures show how community concerns can become a material constraint on infrastructure development, alongside grid capacity and equipment shortages.<\/p>\n<p>The regulatory challenges also differ depending on how a project is structured. <\/p>\n<p>Grid-connected facilities require regulatory approvals for their electricity connections, while behind-the-meter developments can face different permitting requirements.<\/p>\n<p>Developers may improve their chances of progressing by addressing these issues early. <\/p>\n<p>Goldman Sachs highlights the importance of credible community-benefit commitments and transparent plans for managing environmental impacts.<\/p>\n<h2 class=\"wp-block-heading\">Skilled labour becomes another bottleneck<\/h2>\n<p>The AI infrastructure build-out also depends on the availability of workers capable of constructing and operating data centres and power facilities.<\/p>\n<p>In some markets, competing projects are bidding up wages as developers seek to attract workers from a limited labour pool. <\/p>\n<p>These shortages can disrupt projects even after developers have secured land, electricity arrangements and equipment.<\/p>\n<p>The challenge extends across the infrastructure supply chain, from construction to the installation and maintenance of power systems.<\/p>\n<p>Labour constraints could therefore add to project costs and delay the delivery of new capacity, affecting the timing of investment returns.<\/p>\n<p>However, the expansion is also creating skilled, well-paying blue-collar jobs across the US. <\/p>\n<p>This could broaden the economic benefits of AI infrastructure investment beyond technology companies and the digital economy.<\/p>\n<h2 class=\"wp-block-heading\">Financing must adapt to longer project timelines<\/h2>\n<p>The growing complexity of AI infrastructure projects is increasing the need for financing arrangements that can accommodate different construction schedules and investment requirements.<\/p>\n<p>Capital must be coordinated across land acquisition, development, power infrastructure, equipment procurement, construction and long-term operations. <\/p>\n<p>These requirements bring together utilities, hyperscalers, infrastructure investors, private-credit providers, insurers and other long-term sources of capital.<\/p>\n<p>Goldman Sachs&#8217; projections for hyperscaler borrowing illustrate the scale of financing needed to support the industry&#8217;s expansion. <\/p>\n<p>Yet access to funding alone does not guarantee that projects will be completed on schedule.<\/p>\n<p>Delays in power connections, equipment deliveries, or regulatory approvals can push back the point at which infrastructure begins generating revenue. <\/p>\n<p>Longer timelines can increase risk and widen the gap between projects that have secured electricity supplies and those still waiting for grid access.<\/p>\n<p>The report also points to the possibility of a more measured investment cycle. <\/p>\n<p>Although infrastructure constraints can delay growth, a slower build-out may allow demand to absorb new capacity over time, potentially reducing the risk of investing in assets that are not fully utilised.<\/p>\n<h2 class=\"wp-block-heading\">Power availability could shape the AI race<\/h2>\n<p>The infrastructure constraints identified by Goldman Sachs suggest that the next phase of AI expansion will depend as much on the ability to coordinate physical systems as on technological progress.<\/p>\n<p>AI models can improve over months, but expanding electricity generation, transmission capacity and equipment supply can take years. <\/p>\n<p>This mismatch could result in a less linear build-out, with new capacity becoming available in stages as power infrastructure comes online.<\/p>\n<p>The timing of these additions will matter for companies investing in data centres and computing capacity. <\/p>\n<p>Projects with secured power may be better positioned to progress, while those awaiting grid connections could face extended delays.<\/p>\n<p>The report also raises questions about whether markets with the ability to expand generation and grid capacity more quickly, such as China, could develop competitive advantages.<\/p>\n<p>For utilities, the rising demand creates an opportunity to invest in infrastructure and support a growing digital economy. <\/p>\n<p>For investors, however, the scale of the opportunity must be weighed against capital requirements, permitting risks, labour shortages and the time needed to deliver new capacity.<\/p>\n<\/p>\n<p>The post <a href=\"https:\/\/invezz.com\/news\/2026\/10\/24\/why-goldman-sachs-views-grid-and-utilities-as-the-key-ai-growth-bottlenecks\/\">Why Goldman Sachs views Grid and Utilities as the key AI growth bottlenecks<\/a> appeared first on <a href=\"https:\/\/invezz.com\">Invezz<\/a><\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>AI development is increasingly dependent on the physical infrastructure needed to power data centres, with electricity supply, grid connections and utility investment emerging as critical constraints on the industry&#8217;s expansion, according to Goldman Sachs.While advances in AI models continue to drive demand for computing capacity, the infrastructure required to support that growth operates on a&hellip;<\/p>\n","protected":false},"author":1,"featured_media":3113,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-3112","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investing"],"_links":{"self":[{"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/posts\/3112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/comments?post=3112"}],"version-history":[{"count":0,"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/posts\/3112\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/media\/3113"}],"wp:attachment":[{"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/media?parent=3112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/categories?post=3112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/retrotradingreport.com\/index.php\/wp-json\/wp\/v2\/tags?post=3112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}